Past Planning Work - Plan 1:
The 1996 Master Plan was the final product of the BSLA senior class in the Department of Landscape Architecture & Regional Planning at the University of Massachusetts, Amherst, MA who collaborated with their instructors, the Chesterfield Planning Board, and the residents of Chesterfield.
Past Planning Work - Plan 2:
The Hazard Mitigation Plan was adopted by the Chesterfield Select Board on May 19, 2025 and prepared by the Chesterfield Hazard Mitigation Planning Commission and the Pioneer Valley Planning Commission, funded by a grant received by MEMA and MDCS.
Past Planning Work - Plan 3:
Open Space and Recreation Plan
The Open Space and Recreation Plan was adopted in March 2025, and was a collaboration between The Conway School and the Open Space and Recreation Plan Committee.
Past Planning Work - Plan 4:
The Master Plan Phase I was finalized in March 2026 and created by the Pioneer Valley Planning Commission along with the Chesterfield Planning Board.
Click on the applicable cover below to link to the indicated Plan!
Other Resources: